Firefly Energy

Phase I consisted of remodeling a 41,842 SF office/warehouse facility on a 9.9 acre site for a new start-up battery company at 6533 N. Galena Rd, Peoria, Illinois.  Work included updating and new finishes to the 5,771 SF office area and new construction of production, assembling, testing, and support areas in the 36,071 SF warehouse area.  Office renovations included upgrading to existing HVAC systems, new ceiling tile, re-lamping of lighting fixtures and other electrical upgrades, some wall reconfigurations, painting and finishes, and new floor finishes.  Warehouse work included new lighting in critical areas and re-lamping is other areas, new HVAC and make-up air units and ductwork for critical areas, upgrades to some existing HVAC units and ductwork for other areas, new process piping, new dust collector systems, epoxy coated floors in critical areas and floor sealers in other areas.  A new telecommunications system, new security system, and upgrades to the fire alarm and fire sprinkler systems were included throughout the facility.  Two loading docks with five dock levelers and two stationary docks were restored and upgraded.

Details

Project Manager: 
Completion Year: 
2008
Category: 
Firefly Energy
6533 North Galena Road
Peoria, IL
Javascript is required to view this map.